Frequently Asked Questions

A:

Yes. However, we are limited to using the Playspace, the Fab Lab, and the Greenhouse.

A:

Early July 2008 is the best estimate we can provide at this time.

A:

At this time, only Professional Members and their guests, or groups with events on our calendar, can use Bucketworks.

A:

We'd love to show you around the whole place if we give you a tour, and we can't do that right now.

A: We expect to resume them early July 2008.
A:
  • Everything will happen in the Playspace, Fab Lab, and Greenhouse.
  • More stuff will be out in these areas.
  • The Bucketworks offices will be in the Greenhouse during construction.
  • Everyone must use the Side Entrance to enter and exit.
  • The main entrance will be closed.
A:
  • We will do our best to accomodate you with the space we have.
  • We have found alternate spaces as well.
A:

Jenn Turner: 414-305-1324 x702, jenn@bucketworks.org

A:

We broke it down area by area below:

A:

The bathroom near the side entrance will have new insulating ceiling tile.

A:
  • Tile floors.
  • New booths.
  • Some new tables and chairs.
  • New drywall and walls.
  • Insulating ceiling tile.
  • The aquarium will have a makeover in early July.
  • The guest computer terminal will have a new mount point/desk and be upgraded.
A:
  • Tile floors.
  • Larger door for moving refridgerator.
A:
  • New drywall.
  • New carpeting.
A:
  • The Conference Room will have new carpeting.
  • The Conference Room *may* have new walls as well.
A:
  • More outlets in the wall where people meet.
  • More outlets in the floor.
  • New insulating ceiling tile to reduce winter heating costs.
  • New carpeting.
  • A new double door from the Cafe/Lobby, near the Ready Room/ticket window.
  • Aqua Exhibits, the fish store, will be open in early July.
  • Two beautiful aquariums will be visible from the Flowspace.

Who's new

  • Dan
  • gunther3817
  • B_Samic
  • Teecycle_Tim
  • joshjs